Over the last couple of weeks finally some visible progress has been made. As you can see on the pictures, all the walls and ceilings are now ready for painting. Also the stairs and the glass around the gallery has been installed. The stair construction is metal, the steps will be covered by wood. However that will be done completely at the end, when all the workers have left.
Started as well is the work on the tiling. The toilet downstairs is completed. Also both bathrooms upstairs are almost finished. And the laundry room floor tiling is finished. On the ground floor you can see the black tiles on the pictures as well. It looks really nice.
Around the house a lot is happening as well. A well is created (5 meters deep) that will be used for watering the plants in the garden. Also work has started on the fences and the leveling of the garden with the house. And last, but not least, you can see on the pictures there is a big hole. That will be the swimming pool.
Let us know what you think. All comments are welcome.


